Customer-Supplied Material for CNC Machining: Agree the Handover
Customer-supplied material for CNC machining can create a dispute before the first finished part is delivered: the supplier receives fewer usable blanks than expected, a heat number is missing, or neither side has agreed what happens to the remnants. Confirm that the supplier accepts customer-owned stock and agree the handover before shipping it.
Send a material list with the drawing
Identify the grade, condition, stock form, dimensions, quantity and supporting records. Link each identifiable lot to the order and drawing revision. Ask the supplier to review whether the proposed blanks are suitable for the machining plan before treating the delivered quantity as an achievable finished-part quantity.
NQA’s guidance on ISO 9001 operation discusses identification, traceability and protection of customer property, including receipt and incident records. These are useful review points; they do not establish a supplier’s certification or settle the commercial responsibility for rejected material.
Agree the receipt and closeout records
| Stage | Record to agree | Question to resolve |
|---|---|---|
| Before dispatch | Material list, identification and required documents | Has the supplier accepted this stock for the job? |
| On receipt | Quantity and visible-condition acknowledgement | Who reviews a shortage, damage or unidentified lot? |
| Before cutting | Release of any material discrepancy | Must work wait for written instruction? |
| At closeout | Finished parts, rejected pieces and remaining stock | What is returned, retained or disposed of by agreement? |
Separate material quantity from finished quantity
Ask the supplier to state the blank requirement for the requested delivery. Discuss setup pieces, test samples and any extra material it proposes before approving shipment. Treat these as quotation assumptions to confirm, not an automatic allowance the supplier may consume without agreement.
For a repeat order, do not assume last month’s remnant is still available or suitable. Request its identification, dimensions and recorded location before counting it toward the next release. Keep stock from different lots distinguishable where traceability is required.
Resolve an incident before authorizing replacement
If material is lost, damaged or unsuitable, request a factual record: affected identity and quantity, when the issue was found, work already performed and proposed next steps. Agree the disposition and any replacement arrangement through the order’s normal approval route. Do not infer responsibility from a general statement such as “customer material at customer’s risk.” Clarify the actual quoted scope before proceeding.
- Supplier acceptance of customer-owned material.
- Material identity, quantity, condition and documentation.
- Receipt checks and the person authorized to resolve discrepancies.
- Blank requirement and agreed treatment of setup or test pieces.
- Lot identification through manufacturing and inspection.
- Return, retention or agreed disposal of remaining stock.
Use the material certificate checklist for documentation review and the revision-control guide to identify the released drawing. To discuss feasibility, send the part drawing and proposed stock details to tonyzhou@lxcet.com. Acceptance of customer-supplied stock requires confirmation for the individual order.